Tuesday, July 14, 2009

Plumbing by David

This past weekend was Jessica's birthday, so not as much work got done in the bathroom. However, David did manage to get a lot of plumbing done for the toilet and shower. The original pipes were 1.5" diameter, and according to the county inspector, they need to be 2" diameter. Below are before-and-after pics. We've decided that if the whole engineering thing goes south, he can always make a living as a plumber! :-)

First: removal of all original pipes. Toilet on right, shower on left.

**Some assembly required**

The finished product: new toilet drain on right, new shower drain on left. We extended it from its original place because it had first been right next to the wall due to it being a bathtub.

Tuesday, July 7, 2009

Finally an update!

Things have been busy this past Monday/Tuesday, so an update didn't happen. Here it is Tuesday night, 9:20, and there's finally a spare moment!

This past weekend consisted of cutting open the floor for the new shower drain pipes to go. We didn't get a LOT done this weekend, simply because we wanted to enjoy the 4th of July as well. But, here are progress pics:

Before:

After:

Up close and personal:


Happy 4th of July!

Monday, July 6, 2009

Update soon

Update coming a little later today, when Jessica gets home from work.....