Below are the pictures of his hard work. And if any of you are wondering why Jessica hasn't done anything lately, it's because she's 13 weeks pregnant! :-)
First, he installed new plywood for the floor around the new drains.
Then he hammered in the shower curb.
Beautiful curb/edging! Plus, notice the little 3/4" lining pieces. Difficult to find at Home Depot!
Then he removed the original shower valve (see top picture) and put temporary endcaps on the pipes.
Now it's time for new copper pipe fittings!
Dry-fitting the new pipes to make sure they'll work.
Close-up of the dry-fitting. Look at that fancy new shower valve!
Now it's time to solder. He's painting on some sticky stuff (flux - like flux capacitor!) that helps draw the solder into the joint.
Practice pieces from another day.
In action - heating the pipe.
In action - adding the solder.
Finished product!
Voila! Amazing David! And there were no leaks!
What do you mean Jessica is not doing any work? Someone has to take the pictures!
ReplyDeletePlumbers make a lot of money and they have recession and depression-proof jobs! you always need someone to keep the bathrooms going!
ReplyDelete